Reference Library
Browse consolidated international frameworks and country-level imports. Use the filters to focus results and export insights.
| Country | Pillar | Factor | Framework title | Project cycle | Enforcement practice | Approval body | Approval requirements | Approval timeline | Approval cost | Key provisions | Watch developments |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Burkina Faso | Environmental | Deforestation | Site Design through Construction | Forest department oversight with management fund system | Forest Department | N/A | NPA - timeline varies by forest sensitivity and area | Forest Management Fund: Variable taxes 250-600 FCFA (FCFA 250-600 = $0.42-1.00) per unit depending on forest management project | Forest management fund applied to every forest management project with variable taxes | Forest management fund system operational since 1995 | |
| Burkina Faso | Environmental | Wildlife | Code Forestier - Protection de la Faune View sourceWildlife impact assessment required, protected area considerations | Pre-feasibility through Construction | Limited capacity but improving with international support | Wildlife Protection Services | N/A | Within ESIA timeline | Integrated within ESIA - specialist studies may require additional consultant fees | Biodiversity conservation measures, species protection | Wildlife conservation strategy being strengthened |
| Burkina Faso | Social | Slavery | Code Pénal - Dispositions contre la Traite View sourceZero tolerance for forced labour and trafficking, comprehensive worker protection | All phases with continuous oversight | Good enforcement with international cooperation and monitoring | Law enforcement agencies | N/A | Ongoing monitoring throughout project | No fees - government funded enforcement | Complete prohibition of forced labour, trafficking prevention protocols | Strengthening measures with regional cooperation |
| Burkina Faso | Environmental | Solid waste & operational pollution | Code de l'Environnement Articles sur la Gestion des Déchets Solides View sourceSite waste management plans, regular monitoring, pollution prevention measures | Construction through Operations | Better enforcement in urban areas | Local municipal authorities with MEEEA oversight | N/A | NPA - 30-45 days typical for municipal approval | NPA - municipal fees vary by location, not standardized | Regular environmental monitoring, waste disposal protocols | National waste management strategy under development |
| Burkina Faso | Social | Child labour | Code du Travail - Protection de l'Enfant View sourceChild protection measures, minimum age requirements, hazardous work restrictions | All project phases with continuous oversight | Child protection enforcement improving with international support | Child Protection Services | N/A | Immediate compliance required - ongoing monitoring | No fees - government funded monitoring | Zero tolerance policy, strict age verification, protective measures | Child protection framework being strengthened |
| Burkina Faso | Social | Occupational health & safety | Code du Travail - Santé et Sécurité au Travail View sourceComprehensive workplace safety protocols, PPE requirements, training mandatory | All phases with emphasis during construction | Moderate enforcement, improving with training programs | Occupational Health & Safety Inspectorate | N/A | NPA - pre-operation approval timeline varies | NPA - inspection and compliance costs vary by project size | H&S protocols, regular safety training, accident prevention measures | H&S law updates and capacity building ongoing |
| Burkina Faso | Social | Agent safety and security (Rationale: this may fall under occupational H&S but given the sunking incidents, we thought it would be good to make it more explicit.) | Code du Travail et Réglementation de Sécurité View sourceComprehensive worker safety protocols, site security measures, risk assessment requirements | Operations with heightened attention to security in affected regions | Variable coordination between agencies, enforcement affected by security situation | Multiple agencies coordination required | N/A | NPA - pre-deployment security clearance timeline varies | NPA - security assessment and implementation costs vary by location and security situation | Comprehensive security protocols, worker protection, incident response capabilities | Security framework adaptations ongoing due to regional security challenges |
| Burkina Faso | Social | Others.. | Diverses Politiques Sociales - Protection Sociale et Non-Discrimination View sourceSocial protection alignment, gender equality mainstreaming, anti-discrimination compliance | All project phases with continuous monitoring | Improving significantly for donor-funded projects | Coordination between multiple ministries required | N/A | NPA - policy alignment verification timeline varies | NPA - social compliance verification costs vary by specific policies | Social inclusion requirements, protection of vulnerable groups including IDPs, gender equality | Social protection frameworks being strengthened with international support |
| Burkina Faso | Environmental | ESIA | Décret fixant les modalités de réalisation des études d'impact environnemental et social View sourceCategory A: Full EIES; Category B: NIES; Category C: Environmental and Social Prescriptions; energy projects typically Category B or C | All project phases from feasibility to decommissioning | ANEVE oversight with environmental certificate requirement | ANEVE | N/A | NPA - process steps defined but specific timelines not published | NPA - ANEVE fees not published in accessible official sources | Comprehensive assessment with mandatory public participation | Well-established framework with clear categorization |
| Burkina Faso | Environmental | End of life management | Environmental Code waste management provisions View sourceWaste management plan for solar panels, batteries in Environmental and Social Management Plan (ESMP) | Construction through Decommissioning | MEEEA oversight through environmental monitoring | ANEVE | N/A | Integrated within ESIA timeline | Integrated within ESIA fees - no separate waste management charge | Environmental management plan including waste prevention, reduction, reuse, recycling requirements | Waste management standards being developed |
| Burkina Faso | Social | Employment & labour relations | Loi 28-2008/AN du 13 mai 2008 portant Code du travail View sourceEmployment contracts mandatory, local hiring preferences, worker protection standards | Construction through Operations | Labour inspection system exists but limited capacity | Labour Inspection | N/A | NPA - registration timeline not specified | NPA - contract registration fees plus social security contributions not specified | Minimum wage FCFA 45,000 per month for non-farm workers, FCFA 1,918 per day for farm workers effective January 1, 2024[wageindicator] | Labour law framework established |
| Burkina Faso | Environmental | Emission regulations | Loi n° 006-2013/AN du 2 avril 2013 portant Code de l'Environnement View sourceESIA mandatory for energy projects with significant environmental impacts, emission monitoring required | All project phases from feasibility to operations | ANEVE oversight with environmental certificate requirement | Agence Nationale des Évaluations Environnementales (ANEVE) | N/A | NPA - specific timelines not published in accessible documents | NPA - ESIA fees not disclosed in official ANEVE sources | Category A: Full EIES required; Category B: NIES required; Category C: Environmental and Social Prescriptions (PES) required | ESIA framework established with clear categorization system |
| Burkina Faso | Environmental | Land use changes | Loi portant Réorganisation Agraire et Foncière (RAF) View sourceLand permit required, zoning compliance, community consultation for projects | Feasibility through Design | Mixed enforcement, challenges in rural areas | Local government, traditional authorities | N/A | NPA - varies by location and project complexity | NPA - property-based fees vary by region plus administrative fees | Land tenure security measures, customary law recognition | Land governance reforms ongoing |
| Burkina Faso | Social | Community land use | Loi portant Réorganisation Agraire et Foncière (RAF), Loi relative à la sécurisation foncière en milieu rural View sourceMandatory community consultation, formal consent protocols, grievance mechanisms, customary law recognition | Feasibility through Preparation | Mixed enforcement, stronger with international project involvement | Local government, traditional authorities coordinated approach | N/A | NPA - community negotiation timeline varies significantly | NPA - community compensation based on land value plus administrative process fees | Land tenure security measures, participatory management framework, customary rights recognition | Land tenure and rural security law implementation ongoing |
| Burkina Faso | Environmental | Environmental disaster management/business continuity plan (Rationale: minigrids are prone to physical climate risks such as extreme heat and given its fundamental infrastructure status in society, some countries may have policies on disaster management in response to unexpected events such as natural disasters. For example, it may require the infrastructure to be able to operate/perform at a given level of risk or incident frequency.) | Plan National d'Adaptation aux changements climatiques (PNA) View sourceClimate risk assessment and adaptation measures for critical infrastructure | Design through Operations | Limited enforcement except for major infrastructure | Civil Protection Services | N/A | Within ESIA process timeline | Integrated within ESIA - no separate disaster planning fee | Climate adaptation measures, disaster preparedness requirements | National climate adaptation strategy being implemented |
| Burkina Faso | Environmental | Others.. | Politiques transversales environnementales et climatiques View sourceClimate risk analysis, gender mainstreaming in environmental projects, sustainable development compliance | All project phases | Growing enforcement in donor-funded projects | Multiple coordinated departments | N/A | Within ESIA subcomponent timeline | NPA - climate/gender assessments vary by requirements | Climate resilience requirements, gender equality for international projects | Environmental and social frameworks being strengthened |
| Burkina Faso | Social | Community consent | Procédures de Consultation Publique dans les EIES View sourceMandatory community consultation, public participation, documented consent processes, grievance mechanisms | ESIA process with mandatory community engagement | Moderate enforcement - certificate requires adequate public consultation | Environmental Assessment Department | N/A | NPA - consultation periods specified but timelines not detailed | Public consultation costs covered by proponent as part of ESIA process | Mandatory public participation, meaningful consultation, consensus building requirements | Public participation procedures being strengthened in ESIA framework |
| Burkina Faso | Social | Customer relations & consumer protection | Réglementation du secteur de l'électricité View sourceService quality standards, complaint handling mechanisms, tariff regulation | Operations with continuous regulatory oversight | Developing regulatory capacity | Regulatory authority | N/A | NPA - authorization process timeline varies | NPA - authorization fees for service providers not published | Consumer protection protocols, quality standards, dispute resolution mechanisms | Electricity sector regulatory framework under development |
| Burkina Faso | Environmental | Material sourcing (Rationale: much of the emissions for minigrids come from the supply chain such as material sourcing and transportation so it would be good to include them for assessment.) | WAEMU/ECOWAS Common External Tariff (CET) View sourceStandard import requirements for equipment and materials | Procurement through Construction | Standard customs enforcement | Customs Authority | N/A | Standard customs processing times | ECOWAS CET: 0%, 5%, 10%, 20%, 35% tariff bands + 0.5% AES community levy (2025) | ECOWAS CET has five tariff bands - duty-free, 5%, 10%, 20% and 35%; Solar panels and wind turbines: zero tariffs to promote renewable energy | New 0.5% AES (Alliance of Sahel States) import levy introduced March 2025 |