CEIAfrica
CEIAfrica Regulatory Mapping Platform
Beta

Reference Library

Browse consolidated international frameworks and country-level imports. Use the filters to focus results and export insights.

CountryPillarFactorFramework titleProject cycleEnforcement practiceApproval bodyApproval requirementsApproval timelineApproval costKey provisionsWatch developments
Burkina FasoEnvironmentalDeforestation

Code Forestier

View source

Forest clearing permits required, reforestation requirements

Site Design through ConstructionForest department oversight with management fund system​Forest DepartmentN/ANPA - timeline varies by forest sensitivity and areaForest Management Fund: Variable taxes 250-600 FCFA (FCFA 250-600 = $0.42-1.00) per unit depending on forest management project​Forest management fund applied to every forest management project with variable taxes​Forest management fund system operational since 1995​
Burkina FasoEnvironmentalWildlife

Code Forestier - Protection de la Faune

View source

Wildlife impact assessment required, protected area considerations​

Pre-feasibility through ConstructionLimited capacity but improving with international support​Wildlife Protection ServicesN/AWithin ESIA timelineIntegrated within ESIA - specialist studies may require additional consultant feesBiodiversity conservation measures, species protection​Wildlife conservation strategy being strengthened​
Burkina FasoSocialSlavery

Code Pénal - Dispositions contre la Traite

View source

Zero tolerance for forced labour and trafficking, comprehensive worker protection

All phases with continuous oversightGood enforcement with international cooperation and monitoringLaw enforcement agenciesN/AOngoing monitoring throughout projectNo fees - government funded enforcementComplete prohibition of forced labour, trafficking prevention protocolsStrengthening measures with regional cooperation
Burkina FasoEnvironmentalSolid waste & operational pollution

Code de l'Environnement Articles sur la Gestion des Déchets Solides

View source

Site waste management plans, regular monitoring, pollution prevention measures​

Construction through OperationsBetter enforcement in urban areas​Local municipal authorities with MEEEA oversightN/ANPA - 30-45 days typical for municipal approvalNPA - municipal fees vary by location, not standardizedRegular environmental monitoring, waste disposal protocols​National waste management strategy under development​
Burkina FasoSocialChild labour

Code du Travail - Protection de l'Enfant

View source

Child protection measures, minimum age requirements, hazardous work restrictions

All project phases with continuous oversightChild protection enforcement improving with international supportChild Protection ServicesN/AImmediate compliance required - ongoing monitoringNo fees - government funded monitoringZero tolerance policy, strict age verification, protective measuresChild protection framework being strengthened
Burkina FasoSocialOccupational health & safety

Code du Travail - Santé et Sécurité au Travail

View source

Comprehensive workplace safety protocols, PPE requirements, training mandatory

All phases with emphasis during constructionModerate enforcement, improving with training programsOccupational Health & Safety InspectorateN/ANPA - pre-operation approval timeline variesNPA - inspection and compliance costs vary by project sizeH&S protocols, regular safety training, accident prevention measuresH&S law updates and capacity building ongoing
Burkina FasoSocialAgent safety and security (Rationale: this may fall under occupational H&S but given the sunking incidents, we thought it would be good to make it more explicit.)

Code du Travail et Réglementation de Sécurité

View source

Comprehensive worker safety protocols, site security measures, risk assessment requirements

Operations with heightened attention to security in affected regionsVariable coordination between agencies, enforcement affected by security situationMultiple agencies coordination requiredN/ANPA - pre-deployment security clearance timeline variesNPA - security assessment and implementation costs vary by location and security situationComprehensive security protocols, worker protection, incident response capabilitiesSecurity framework adaptations ongoing due to regional security challenges
Burkina FasoSocialOthers..

Diverses Politiques Sociales - Protection Sociale et Non-Discrimination

View source

Social protection alignment, gender equality mainstreaming, anti-discrimination compliance

All project phases with continuous monitoringImproving significantly for donor-funded projectsCoordination between multiple ministries requiredN/ANPA - policy alignment verification timeline variesNPA - social compliance verification costs vary by specific policiesSocial inclusion requirements, protection of vulnerable groups including IDPs, gender equalitySocial protection frameworks being strengthened with international support
Burkina FasoEnvironmentalESIA

Décret fixant les modalités de réalisation des études d'impact environnemental et social​

View source

Category A: Full EIES; Category B: NIES; Category C: Environmental and Social Prescriptions; energy projects typically Category B or C​

All project phases from feasibility to decommissioningANEVE oversight with environmental certificate requirement​ANEVEN/ANPA - process steps defined but specific timelines not publishedNPA - ANEVE fees not published in accessible official sourcesComprehensive assessment with mandatory public participation​Well-established framework with clear categorization​
Burkina FasoEnvironmentalEnd of life management

Environmental Code waste management provisions

View source

Waste management plan for solar panels, batteries in Environmental and Social Management Plan (ESMP)​

Construction through DecommissioningMEEEA oversight through environmental monitoring​ANEVEN/AIntegrated within ESIA timelineIntegrated within ESIA fees - no separate waste management chargeEnvironmental management plan including waste prevention, reduction, reuse, recycling requirements​Waste management standards being developed​
Burkina FasoSocialEmployment & labour relations

Loi 28-2008/AN du 13 mai 2008 portant Code du travail

View source

Employment contracts mandatory, local hiring preferences, worker protection standards

Construction through OperationsLabour inspection system exists but limited capacityLabour InspectionN/ANPA - registration timeline not specifiedNPA - contract registration fees plus social security contributions not specifiedMinimum wage FCFA 45,000 per month for non-farm workers, FCFA 1,918 per day for farm workers effective January 1, 2024[wageindicator]Labour law framework established
Burkina FasoEnvironmentalEmission regulations

Loi n° 006-2013/AN du 2 avril 2013 portant Code de l'Environnement​

View source

ESIA mandatory for energy projects with significant environmental impacts, emission monitoring required​

All project phases from feasibility to operationsANEVE oversight with environmental certificate requirement​Agence Nationale des Évaluations Environnementales (ANEVE)​N/ANPA - specific timelines not published in accessible documentsNPA - ESIA fees not disclosed in official ANEVE sourcesCategory A: Full EIES required; Category B: NIES required; Category C: Environmental and Social Prescriptions (PES) required​ESIA framework established with clear categorization system​
Burkina FasoEnvironmentalLand use changes

Loi portant Réorganisation Agraire et Foncière (RAF)

View source

Land permit required, zoning compliance, community consultation for projects

Feasibility through DesignMixed enforcement, challenges in rural areas​Local government, traditional authoritiesN/ANPA - varies by location and project complexityNPA - property-based fees vary by region plus administrative feesLand tenure security measures, customary law recognition​Land governance reforms ongoing​
Burkina FasoSocialCommunity land use

Loi portant Réorganisation Agraire et Foncière (RAF), Loi relative à la sécurisation foncière en milieu rural

View source

Mandatory community consultation, formal consent protocols, grievance mechanisms, customary law recognition

Feasibility through PreparationMixed enforcement, stronger with international project involvementLocal government, traditional authorities coordinated approachN/ANPA - community negotiation timeline varies significantlyNPA - community compensation based on land value plus administrative process feesLand tenure security measures, participatory management framework, customary rights recognitionLand tenure and rural security law implementation ongoing
Burkina FasoEnvironmentalEnvironmental disaster management/business continuity plan (Rationale: minigrids are prone to physical climate risks such as extreme heat and given its fundamental infrastructure status in society, some countries may have policies on disaster management in response to unexpected events such as natural disasters. For example, it may require the infrastructure to be able to operate/perform at a given level of risk or incident frequency.)

Plan National d'Adaptation aux changements climatiques (PNA)

View source

Climate risk assessment and adaptation measures for critical infrastructure​

Design through OperationsLimited enforcement except for major infrastructure​Civil Protection ServicesN/AWithin ESIA process timelineIntegrated within ESIA - no separate disaster planning feeClimate adaptation measures, disaster preparedness requirements​National climate adaptation strategy being implemented​
Burkina FasoEnvironmentalOthers..

Politiques transversales environnementales et climatiques

View source

Climate risk analysis, gender mainstreaming in environmental projects, sustainable development compliance​

All project phasesGrowing enforcement in donor-funded projects​Multiple coordinated departmentsN/AWithin ESIA subcomponent timelineNPA - climate/gender assessments vary by requirementsClimate resilience requirements, gender equality for international projects​Environmental and social frameworks being strengthened​
Burkina FasoSocialCommunity consent

Procédures de Consultation Publique dans les EIES

View source

Mandatory community consultation, public participation, documented consent processes, grievance mechanisms

ESIA process with mandatory community engagementModerate enforcement - certificate requires adequate public consultationEnvironmental Assessment DepartmentN/ANPA - consultation periods specified but timelines not detailedPublic consultation costs covered by proponent as part of ESIA processMandatory public participation, meaningful consultation, consensus building requirementsPublic participation procedures being strengthened in ESIA framework
Burkina FasoSocialCustomer relations & consumer protection

Réglementation du secteur de l'électricité

View source

Service quality standards, complaint handling mechanisms, tariff regulation

Operations with continuous regulatory oversightDeveloping regulatory capacityRegulatory authorityN/ANPA - authorization process timeline variesNPA - authorization fees for service providers not publishedConsumer protection protocols, quality standards, dispute resolution mechanismsElectricity sector regulatory framework under development
Burkina FasoEnvironmentalMaterial sourcing (Rationale: much of the emissions for minigrids come from the supply chain such as material sourcing and transportation so it would be good to include them for assessment.)

WAEMU/ECOWAS Common External Tariff (CET)​

View source

Standard import requirements for equipment and materials​

Procurement through ConstructionStandard customs enforcement​Customs AuthorityN/AStandard customs processing timesECOWAS CET: 0%, 5%, 10%, 20%, 35% tariff bands + 0.5% AES community levy (2025)​ECOWAS CET has five tariff bands - duty-free, 5%, 10%, 20% and 35%; Solar panels and wind turbines: zero tariffs to promote renewable energy​New 0.5% AES (Alliance of Sahel States) import levy introduced March 2025​
BurundiSocialEmployment & labour relations

Code du Travail

View source

Employment contracts mandatory, worker protection standards​

Construction through OperationsLabour inspection system existsLabour InspectionN/AStandard registration timelineEmployer social security: 6% of gross salary (capped at BIF 450,000/month = max BIF 27,000); Employee: 4% (capped at BIF 450,000 = max BIF 18,000); Accident Risk Fund (employer only): 3% of gross salary (capped at BIF 80,000/month = max BIF 2,400)​Workers entitled to 1 day rest per week (24 consecutive hours), principally Sunday​Labour framework established
Showing 1-20 of 427 entries
Page 1 of 22